VCO Analysis · Sub-Scenario Comparison · ScenarioID 361x
EMEA Deliver Network — Mass ITHUB
16 July 2026 · Revenue constant at €1,501,470,705 across all scenarios · 7 sub-scenarios available · Static data — connect proxy to load live SQL
Scenario Set
Select Scenarios to Compare
Currency
Cost Summary — All Selected Scenarios vs Base Line
Δ columns show change from Base Line; green = saving, red = increase
Total Cost Breakdown by Scenario
Stacked: IBF / Freight · Handling (Receiving + Picking) · Storage — hover for values
Shipping & Inventory Volumes (Pallets)
IBF inbound · OBF outbound · Inventory held at period end
Storage Cost & Inventory Value ($)
Only scenarios with stocked inventory show non-zero values
Compare
vs
· Controls: Shipping by Destination · DC Flow Sankey · Plant → DC Assignment
Shipping by Destination — Intracompany (IBF)
Comparing 3610 · Base Line
vs 3611 · New DC - Italy
· ITHUB is a new node introduced in 3611 · Location-level data for other scenarios pending
DC Flow — Intracompany DC → DC
Pallets: DC → DC · shared scale · hover for values
Serving Plant → First DC Assignment
Pallets: Plant → First DC · shared scale · hover for values
Storage Impact — Pallets & Cost per DC
Baseline vs scenario · delta pallets · storage and handling cost effect
EMEA Distribution Network Map
Plant → DC · DC → DC · DC → Customer flows · hover lines for details
Scenario set 417 · Aug 2026
No map data available for the selected scenario set.
Upload ShippingMap.csv for scenario set 361 to enable.